What's inside

Two pages, zero fluff

Every figure in this guide traces to a named source — verified 2026 publications.

The AFAP rule

The AFAP rule: why cost-benefit weighing has no place in an EU file, and where ALARP still survives.

The file

The file: the risk management plan, analysis, controls, and residual-risk chain auditors trace.

The practice

The practice: the 5×5 matrix, lifecycle updates, and the failure modes that sink reviews.

Complete guide

The guide in full

Every section of the PDF on one page. Use the form above to keep a copy.

1. The AFAP rule

  • For CE-marked devices, risks must be reduced as far as possible (AFAP) — without economic considerations (MDR Annex I, GSPR 1–4). Cost-benefit weighing has no place in the acceptability decision.
  • ALARP ('as low as reasonably practicable') — which permits cost-benefit weighing — is not acceptable under the EU MDR. ISO 14971:2019 itself removed ALARP from the normative text; a notified body will flag it.
  • ALARP may persist in some non-EU jurisdictions — if used outside the EU, flag the deviation from EU requirements explicitly in the file.

2. The file

  • The risk management file must contain: the risk management plan (scope, acceptability criteria, responsibilities, verification methods, production/post-production monitoring); risk analysis (FMEA, HAZOP, or other systematic hazard identification); risk evaluation with severity and probability assignments.
  • Plus: risk control measures with design rationale; residual risk evaluation; evidence of design verification that controls function; independent review records with qualified sign-off; and post-market surveillance and trend analysis updates.
  • Benefit-risk analysis closes the loop: a high-risk device may be acceptable with substantial benefit and no alternatives; even moderate risk may be unacceptable where safer alternatives exist.

3. The practice

  • Define the 5×5 acceptability matrix in the plan: low (document and accept — still reduce AFAP), medium (reduce AFAP, document why further reduction is impossible), high (reduction required), unacceptable (design change mandatory).
  • Risk management is a lifecycle process: update the assessment with field experience, design changes, and post-market data — the file must show every step was completed and every decision justified.
  • Common failure modes: ALARP criteria in an EU file, controls without verification evidence, residual risks never re-evaluated after controls, and PMS data that never reaches the risk assessment.

Sources & scope

  • github.com (rajgupta25/startup), risk-management-specialist skill.
  • matrixone.health, ISO 14971 Risk Management for Medical Devices: A Complete Process Guide.

This guide is market-access intelligence, not regulatory or engineering advice. Risk management requirements and notified-body practice change — professional review is required before business use.

Market Access Strategy Session

Risk management on your 2026 roadmap? Start with the full picture.

A Market Access Strategy Session maps your risk route — AFAP planning, risk file architecture, and NB-ready documentation.

Professional review is required before business use.