Skip to main content
Start Project

Free field guide · PDF

IVD Medical Device Registration2026 Field Guide

The Class C 2026 milestones, the 80% NB flip, and the class-by-class timeline — with the transition practice you need.

Class C NB agreement
26 Sep 2026
Now need NB review
~80%
Avg. NB certification
18–24 mo

Sourced from IVDR guidance and verified 2026 publications.

Download the free guide

Enter your work email and we'll send the PDF straight to your inbox.

Professional review is required before business use. See our privacy policy.

What's inside

Five pages, zero fluff

Every figure in this guide traces to a named source — IVDR guidance and verified 2026 publications.

The Class C 2026 milestones

NB application by 26 May 2026 and a signed agreement by 26 September 2026 — miss them and you lose the extension.

The 80% flip

80% of IVDs were self-certified under the Directive; ~80% now need Notified Body review under the IVDR.

The class-by-class clock

Class D, C, B, and A-sterile transition ends from 2027 to 2029 — with NB transfer options if capacity bites.

Sources & scope

  • sgs.com, Is Your Class C IVD Transition on Track? (Apr 2026).
  • bsigroup.com, (EU) 2024/1860 — IVDR 26 September 2026 deadline approaching (Aug 2026).
  • tuvsud.com, IVDR transition timeline.
  • linkedin.com (Aurevia QARA), The IVDR Transition Is Not Over (2026).

This guide is market-access intelligence, not regulatory or legal advice. IVDR timelines, guidance, and Notified Body practice change — professional review is required before business use.

Market Access Strategy Session

IVDR on your 2026 roadmap? Start with the full picture.

A Market Access Strategy Session maps your IVDR route — Notified Body selection, milestone planning, and class-by-class transition mapping.

Professional review is required before business use.