Skip to main content

Field guide · PDF

IVD Medical Device Registration2026 Field Guide

The Class C 2026 milestones, the 80% NB flip, and the class-by-class timeline — with the transition practice you need.

Class C NB agreement
26 Sep 2026
Now need NB review
~80%
Avg. NB certification
18–24 mo

Sourced from IVDR guidance and verified 2026 publications.

Download the guide

Enter your work email and we'll send the PDF straight to your inbox.

Professional review is required before business use. See our privacy policy.

What's inside

Two pages, zero fluff

Every figure in this guide traces to a named source — IVDR guidance and verified 2026 publications.

The Class C 2026 milestones

NB application by 26 May 2026 and a signed agreement by 26 September 2026 — miss them and you lose the extension.

The 80% flip

80% of IVDs were self-certified under the Directive; ~80% now need Notified Body review under the IVDR.

The class-by-class clock

Class D, C, B, and A-sterile transition ends from 2027 to 2029 — with NB transfer options if capacity bites.

Complete guide

The guide in full

Every section of the PDF on one page. Use the form above to keep a copy.

1. The Class C 2026 milestones

  • Regulation (EU) 2024/1860 extended IVDR transition timelines — but the extension is conditional, not automatic. To keep legacy Class C devices on the market until 31 December 2028, manufacturers must hit interim milestones:
  • 26 May 2025: IVDR-compliant Quality Management System in place (all classes).
  • 26 May 2026: formal conformity-assessment application lodged with a Notified Body.
  • 26 September 2026: signed written agreement with that Notified Body.
  • Miss the May 2026 application window and you lose the extended transition — the device must be pulled from the market until a full IVDR certificate is granted, a process taking 18–24 months on average.

2. The 80% flip and the class-by-class clock

  • Under the old IVD Directive, roughly 80% of IVDs were self-certified. Under the IVDR, that ratio flipped — ~80% now require Notified Body review, driving capacity bottlenecks and long review queues.
  • Class D: application 26 May 2025, signed agreement 26 Sept 2025, transition end 31 Dec 2027.
  • Class C: application 26 May 2026, signed agreement 26 Sept 2026, transition end 31 Dec 2028.
  • Class B and sterile Class A: application 26 May 2027, signed agreement 26 Sept 2027, transition end 31 Dec 2029.

3. Market-access implications

  • Even after a transition deadline, IVDR applications can be transferred to another Notified Body while keeping transition status — useful if your current NB is capacity-constrained.
  • The 26 September 2026 agreement deadline for Class C is the last actionable gate this year — treat it as a live project milestone, not a paperwork formality.
  • With only a handful of appointed IVD Notified Bodies in Europe, NB selection is the binding constraint — start the conformity-assessment conversation before the dossier is finished.

Sources & scope

  • sgs.com, Is Your Class C IVD Transition on Track? (Apr 2026).
  • bsigroup.com, (EU) 2024/1860 — IVDR 26 September 2026 deadline approaching (Aug 2026).
  • tuvsud.com, IVDR transition timeline.
  • linkedin.com (Aurevia QARA), The IVDR Transition Is Not Over (2026).

This guide is market-access intelligence, not regulatory or legal advice. IVDR timelines, guidance, and Notified Body practice change — professional review is required before business use.

Market Access Strategy Session

IVDR on your 2026 roadmap? Start with the full picture.

A Market Access Strategy Session maps your IVDR route — Notified Body selection, milestone planning, and class-by-class transition mapping.

Professional review is required before business use.